Free tool

    AI production-readiness score

    Answer 11 questions about one AI workload. You get a score out of 100, a band, and the three places that cost the most points.

    v1 stores nothing and sends no answers anywhere.

    For a planning checklist on one use case, read the AI readiness assessment: six practical checks. This page does not replace that article. It scores the production-readiness questions.

    Question 1 of 11

    Integrations and adoption

    Is at least one AI workload used every week by people who are not on the team that built it?

    Method

    Five dimensions are worth 20 points each: Knowledge and context, Integrations and adoption, Permissions and audit, Operating model, and Cost and model control. Every answer has a fixed point value. There is no extra weighting and no randomness. The same answers always give the same score. Not sure scores 0, because a control nobody can confirm does not help in production. Scoring version v1-draft-2026-11-22.

    Bands

    BandScore
    Pilot0 to 39
    Emerging40 to 64
    Production65 to 84
    Governed production85 to 100

    Questions people ask

    How is the score calculated?

    Five dimensions are worth 20 points each: Knowledge and context, Integrations and adoption, Permissions and audit, Operating model, and Cost and model control. Every answer has a fixed point value. There is no extra weighting and no randomness. The same answers always give the same score. Not sure scores 0, because a control nobody can confirm does not help in production. Scoring version v1-draft-2026-11-22.

    What are the score bands?

    Pilot is 0 to 39. Emerging is 40 to 64. Production is 65 to 84. Governed production is 85 to 100. Each band includes its lower bound.

    When is the band capped at Emerging?

    Production and Governed production need a Yes to question 1, a workload used every week by people outside the build team. Otherwise the band is capped at Emerging. The numeric score does not change. A high score with no weekly users outside the build team describes paperwork, not production.

    How are the biggest gaps chosen?

    The three biggest gaps are the questions with the most points lost. If two questions lost the same number of points, the earlier question comes first. Each next step can be done without buying Chiri.

    What does this page store?

    v1 stores nothing and sends no answers anywhere. Copy link puts answers in the URL fragment, after the #. Browsers do not send that fragment to servers. There is no email field, and the score is not gated. Company size and industry are optional and are not scored. If you copy a link, those optional answers stay in the same fragment. They are not sent to Chiri.

    Questions and points

    1. Is at least one AI workload used every week by people who are not on the team that built it? Integrations and adoption, maximum 10.

      • Yes: 10
      • Yes, but only a small trial group: 5
      • No: 0
      • Not sure: 0

      Next step: Pick one workload and get it into weekly use by a named group outside the build team. Write down who uses it and how often.

    2. How many business systems does that workload read from or write to through a working integration (not copy and paste)? Integrations and adoption, maximum 10.

      • None: 0
      • 1: 5
      • 2 to 3: 8
      • 4 or more: 10

      Next step: List the systems people copy and paste between for this workload, then connect the one used most (read-only access first).

    3. Where does the knowledge the workload needs (policies, products, accounts, current projects) live? Knowledge and context, maximum 10.

      • Mostly in people's heads: 0
      • In documents and wikis people search by hand: 3
      • Partly in a system an application can query: 7
      • In maintained sources an application can query, with an owner: 10

      Next step: Choose the 20 to 50 documents or records the workload depends on most, give them an owner, and put them somewhere an application can query.

    4. Is there a written review of accuracy and hallucination risk for that workload? Knowledge and context, maximum 10.

      • No: 0
      • Informal spot checks: 3
      • A written review, done once: 7
      • A written review with a test set, repeated on changes: 10

      Next step: Write 25 to 50 real questions with known correct answers, run the workload against them, and record the results. Re-run when the model or prompt changes.

    5. Can you say who is allowed to run, approve, or change an AI workflow? Permissions and audit, maximum 7.

      • No: 0
      • Informally: 2
      • Written down, not enforced in tools: 4
      • Written down and enforced through access controls: 7

      Next step: Write a one-page table of who can run, approve and change each AI workflow, then match it to the access settings in the tools you use.

    6. Are prompts, outputs and tool calls logged in a way you could audit? Permissions and audit, maximum 7.

      • No: 0
      • Partly, or only in a vendor console: 2
      • Yes, but no one reviews them: 5
      • Yes, retained and reviewed on a schedule: 7

      Next step: Turn on logging of prompts, outputs and tool calls for the workload, decide how long to keep them, and name who reviews a sample each month.

    7. Is there a data-retention rule for model providers, including a no-training or no-retention term? Permissions and audit, maximum 6.

      • No: 0
      • Not sure: 0
      • Default vendor terms only: 2
      • Yes, in a contract or written policy: 6

      Next step: Check each model provider's data-use and retention terms, record which ones train on or keep your data, and write the rule your team must follow.

    8. Who owns the workload in production? Operating model, maximum 10.

      • No one: 0
      • A vendor only: 3
      • The build team, informally: 5
      • IT or a central AI team: 8
      • A named business owner with IT or AI team support: 10

      Next step: Name one person accountable for the workload in production, and one technical contact who supports it. Put both names where users can find them.

    9. When the model changes or the workload breaks, is there an owner and a fallback? Operating model, maximum 10.

      • No: 0
      • Someone would notice and fix it: 3
      • An owner, but no fallback: 6
      • An owner and a documented fallback (manual process or another model): 10

      Next step: Write down what users do when the workload is down or wrong (manual steps or a second model), and who is paged.

    10. Do you have a budget and a usage cap for AI spend? Cost and model control, maximum 10.

      • Spend is ad hoc: 0
      • A budget, no cap or tracking: 4
      • A budget and monthly tracking: 7
      • A budget, tracking, and hard caps or alerts: 10

      Next step: Set a monthly budget for the workload, turn on the provider's usage alerts or caps, and review actual spend once a month.

    11. In the last 12 months, how many AI tools did you try, and how many are still in weekly use? Cost and model control, maximum 10.

      Two whole numbers: tools tried, and tools still in weekly use. Kept is capped at tried. 0 tried or 0 kept: 0. Kept divided by tried under 0.25: 3. From 0.25 up to but not including 0.5: 6. 0.5 or more: 10.

      Next step: List every AI tool tried in the past year, retire the ones not used weekly, and pick a default for each job so spend and data stay in fewer places.

    Optional, not scored

    Company size. Under 200 employees; 200 to 999; 1,000 to 5,000; Over 5,000; Prefer not to say.

    Industry. Manufacturing; Distribution and logistics; Financial services; Healthcare; Professional services; Retail and consumer; Software and technology; Other; Prefer not to say.

    Changelog

    • 2026-11-22. v1 draft. Questions, points, bands, and the question 1 gate were set. The draft was not published on this date.
    • 2026-11-27. Published at /tools/production-readiness. Scoring is unchanged from the 2026-11-22 draft.